House projects along West Riverside
West Riverside is a narrow strip of older houses on small lots between the road and the river, and almost every order here is a single unit. A West Riverside remodel takes that unit at the road end of the drive, because there is rarely room for a truck any further in. Garages, decks and reroofing jobs through West Riverside hold the unit for two or three weeks and then it comes straight out.
Septic and water line replacements at West Riverside are the other steady job, and those units sit where the excavator is not working. Owners along West Riverside usually want the unit tucked behind a hedge or a shed rather than out at the road edge.
Storm cleanup through West Riverside
Wind comes down the canyon hard, and it puts cottonwoods and pines across the West Riverside lots most years. Tree crews working West Riverside order a standard unit and a handwashing station for the week or two it takes to clear a stretch. Those West Riverside orders come in fast after a storm, and the pickup is arranged as soon as the chipper moves on.
Ice and heavy wet snow also break limbs through West Riverside, so cleanup work here is not only a summer thing.
Winter lanes at West Riverside
The river road and the side lanes through West Riverside are narrow, and once the snow is pushed to the edges there is very little room left. A West Riverside winter placement goes at the widest point near the road rather than down beside the house. Shade off the canyon wall holds ice on the West Riverside lanes long after the open valley has thawed out.
Spring runoff on the Clark Fork reaches the low ground at West Riverside, so nothing gets set where the water has been before. Frost past three feet under West Riverside means every unit is ballasted rather than pinned into the ground.
